The crane is rotated to the pre-agreed "parked" position to allow the assist crane access.

Attach the assist crane to the jib at designated lifting points. Remove pins and lower the jib to the ground for further disassembly.

This is the core of the document. It provides a chronological sequence of the dismantling phases, which are detailed further below. The Step-by-Step Dismantling Process

Specifically Part 2 for inspection, testing, and dismantling (United Kingdom). tower crane dismantling method statement

The climbing frame, which was used to raise the crane during its operational life, is removed. This component is typically dismantled in sections.

Tools must be secured with lanyards/tethers to prevent dropped object injuries. Personal Protective Equipment (PPE) All personnel within the exclusion zone must wear: High-visibility clothing

Technicians unpin the jib from the tower, and it is lowered to the ground to be dismantled into smaller sections. Step 4: Removing the Operator Cabin and Slewing Unit The crane is rotated to the pre-agreed "parked"

| Equipment Category | Specific Items | |-------------------|----------------| | Auxiliary Crane | Mobile crane of sufficient capacity to handle the heaviest component (e.g., LTM 1450-8.1 for large tower cranes) | | Lifting Gear | Slings, shackles, spreader bars—inspected and certified | | Hand Tools | Wrenches, sledgehammers, pin pullers, hydraulic jacks | | Safety Equipment | Harnesses, lanyards, anchor points, safety nets | | Communication | Two-way radios, hand signals, clear line-of-sight protocols |

This represents one of the heaviest singular lifts. Rig the entire slewing assembly using heavy-duty rated shackles, unbolt it from the top mast section, and lower it directly onto a awaiting low-boy trailer. Phase 6: Mast Section Demobilization

Skilled team performing the mechanical disassembly. 3. Equipment & Tools This is the core of the document

A dedicated rescue kit (including a suspension trauma relief strap and descender rescue system) must be on-site, with a trained rescue team ready to retrieve an incapacitated worker from the mast.

A documented, detailed method statement should be readily available on site so workers can reference any details of the dismantling procedure as needed.

Responsible for securing loads, checking lifting gear, and giving clear signals to the crane operators. 3. Required Resources & Machinery 3.1 Primary Lifting Equipment

Carrito de compra
Scroll to Top
tower crane dismantling method statement
Resumen de privacidad

Esta web utiliza cookies para que podamos ofrecerte la mejor experiencia de usuario posible. La información de las cookies se almacena en tu navegador y realiza funciones tales como reconocerte cuando vuelves a nuestra web o ayudar a nuestro equipo a comprender qué secciones de la web encuentras más interesantes y útiles.