Ogee Spillway — Designxls Install Hot!

If you are building or installing a design spreadsheet, organize it into these functional tabs: Functionality Key Inputs Defines project constraints. Peak Flow ( ), Crest Width ( ), Crest Elev. Hydraulics Solves for Hdcap H sub d Cdcap C sub d Iterative solver for Profile Gen Calculates coordinates. Standard USACE/USBR nappe equations. Energy Diss. Designs the Stilling Basin. Conjugate depth, Jump length, Froude Number. 🛠️ "Install" and Setup Guide

xn=K⋅Hdn−1⋅yx to the n-th power equals cap K center dot cap H sub d raised to the n minus 1 power center dot y : Coordinates from the crest origin.

Elias noticed the spreadsheet flagged a potential issue with the bridge piers. The "Piers & Abutments" section allowed him to adjust the Pier Coefficient ( cap K sub p Abutment Coefficient ( cap K sub a ogee spillway designxls install

The design of an ogee crest is dictated by a specific "design head" ( cap H sub d

yHd=−KHdn(x)1.85the fraction with numerator y and denominator cap H sub d end-fraction equals negative the fraction with numerator cap K and denominator cap H sub d to the n-th power end-fraction open paren x close paren to the 1.85 power x, y: Coordinates from the apex of the crest. K, n: Constants depending on upstream slope/friction. If you are building or installing a design

Beichley and A. J. Peterka; Hyd-445 dated April 28, 1961, by A. J. Peterka; Hyd-446 dated April 18, 1960, by G. L. Beichley and A. Bureau of Reclamation (.gov) (PDF) Ogee Spillway Profile: Spreadsheet - ResearchGate

automate the complex mathematical iterations required for accurate modeling. ExcelCalcs 1. Installation and Setup Standard USACE/USBR nappe equations

Worth downloading for preliminary hydraulic sizing. It acts as a great independent check against HEC-RAS or HEC-HMS outputs. However, never use the output for final construction drawings without manually verifying the coordinate calculations against standard USBR design charts.

Below is a story about the journey of an engineer, Elias, who uses an "ogee spillway design.xls" tool to tackle a high-stakes project. The Curve of the Nappe

: If you need to modify the underlying calculations, ensure the Developer Tab is visible in Excel (found under File > Options > Customize Ribbon Input Parameters : Standard inputs typically include: Design Discharge ( The peak flow rate the spillway must handle. Design Head ( cap H sub e The depth of water above the crest level. Crest Height ( Height of the spillway crest above the river bed. 3. Key Design Components

The discharge coefficient (C) is often derived from a lookup table. The user must verify that the table ranges match the input units. For example, if the spreadsheet expects H_d in meters but the user inputs feet, the coefficient will be incorrect. No software installation fixes this—it requires manual unit verification.