Gunnebo Speedstile Fl Installation Manual Free Jun 2026

Align the template precisely with your architectural centerlines using a chalk line or laser level.

Place a high-precision spirit level along the top longitudinal rail of the first cabinet. Use the adjustable leveling feet inside the base of the cabinet to achieve perfect horizontal leveling. Repeat the process for the opposing cabinet.

Ensure the walking lane is completely clear of objects, tools, and personnel. Switch on the internal circuit breaker.

Connect the normally open (NO) contact from the card reader/biometric relay to the main controller board terminal marked IN1 or OPEN_A .

Connect the Phase (Live), Neutral, and Earth (Ground) wires to the designated DIN-rail terminals. gunnebo speedstile fl installation manual

This circuit must be wired as a Normally Closed (NC) loop. If the building loses power or the fire loop breaks, the speed gate instantly unlocks and springs open via internal energy storage (fail-safe operation). 6. Commissioning and Software Calibration

All electrical work must be performed by authorized personnel according to the manual's specifications.

Drill the anchor holes to the depth specified by the anchor manufacturer (usually 80mm–100mm).

Access the onboard interface using the digital display or by connecting a laptop via the Gunnebo service tool. Repeat the process for the opposing cabinet

Use a spirit level to check the frame in both transverse and longitudinal directions.

The Gunnebo SpeedStile FL is a reliable and efficient pedestrian gate solution for secure access control. By following this installation manual, you can ensure a successful installation and optimal performance of the SpeedStile FL. If you have any questions or concerns, please consult the Gunnebo support team or a qualified installation professional.

Prepare the floor cabling, ensuring access to a reliable power source and network cabling for access control integration.

Connect the power and data cables according to the wiring diagrams in the manual. Connect the normally open (NO) contact from the

I can provide tailored wiring schematics or specific programming codes based on your setup. Share public link

Retrieve the floor template provided by Gunnebo for your specific lane configuration (e.g., standard 600mm lane or wide 900mm PMR lane). Mark the centerline of the lane on the finished floor.

Status display turns green; glass wings open smoothly in the direction of travel; gate closes immediately after passage.

Ensure the main circuit breaker is padlocked in the "OFF" position before handling any high-voltage wiring. Electrical work must be performed by a certified electrician. Main Power Connection

Connect the communication cables between the left and right cabinets. 4. Testing and Commissioning

All under-floor conduits for power and data must be cast into the floor or trenched precisely according to the specific model's footprint layout drawing. Environmental Conditions